The short answer
If your house is in a designated bushfire prone area and was built or approved before 10 September 2009, you can clear any vegetation, including trees, within 10 metres of it without a planning permit, and any vegetation except trees within 30 metres. The CFA calls that the 10/30 rule. In the Bushfire Management Overlay the 30 becomes 50 metres (the CFA's "10/50 rule"). Newer houses usually need a permit. Check your VicPlan report and ask council before you cut.
Bushfire prone area or Bushfire Management Overlay?
They're two different maps, and both show up on the free planning property report from VicPlan.
Bushfire prone area (BPA)
A state map of land at risk from bushfire, used by the building regulations. It covers much more land than the overlay, and being in it is what switches on the clearing exemptions in Clause 52.12 of the planning scheme.
Bushfire Management Overlay (BMO)
A planning overlay over the highest-risk land. Clause 44.06 aims to "ensure that the development of land prioritises the protection of human life and strengthens community resilience to bushfire". It requires a permit to subdivide and for buildings and works such as a new house, and those applications must meet the bushfire planning rules in Clause 53.02. The CFA notes that "the Bushfire Management Overlay is included in bushfire prone areas".
The overlay doesn't, on its own, make cutting a tree a permit trigger. The usual native vegetation rules and any other overlays on your land still apply, and in the BMO the clearing exemption reaches further.
Need this done?
The 10/30 rule, and 10/50 in the overlay
Clause 52.12 lets you clear around an existing house without a planning permit:
- Within 10 metres: "any vegetation", including trees
- Within 30 metres: "any vegetation, except trees", in a bushfire prone area
- Within 50 metres, in the BMO: "any vegetation, except trees"
It applies, in the CFA's words, "to buildings, including houses, which are used for accommodation and were built or approved before 10 September 2009". For a house built after that date, the CFA says "you will likely require a permit to clear vegetation" and to contact council. There are a few other cases in the BMO for homes lawfully built or approved between 10 November 2009 and 10 November 2011.
You may also have seen "10/50" described as a New South Wales rule. NSW has its own, different 10/50 scheme; in Victoria the CFA uses the name for the BMO version of the exemption above.
Clearing along a fence line
Clause 52.12 also covers boundary fences in bushfire prone areas. If the fence was built before 10 September 2009, owners and residents can clear vegetation along it, up to a combined 4 metres across both sides. The CFA lists these:
- Neighbour has cleared 1 m from the fence: you can clear up to 3 m on your side
- Neighbour has cleared 2 m: you can clear up to 2 m
- Neighbour has cleared 4 m or more: you can still clear up to 1 m
For a fence built after 10 September 2009, the CFA says you likely need a planning permit. And the CFA is clear that "you must get written permission from your neighbour before clearing any vegetation on their property".
What "defendable space" looks like
New homes in the BMO have to keep defendable space to standards set in Clause 53.02. Even if your home predates the overlay, its Table 4 is a good checklist for the ground around any bush-edge house. Among its requirements:
- "Trees must not overhang or touch any elements of the building"
- "The canopy of trees must be separated by at least 5 metres"
- "There must be a clearance of at least 2 metres between the lowest tree branches and ground level"
- "Shrubs must not be located under the canopy of trees"
- "Grass must be short cropped and maintained during the declared fire danger period"
Much of that is pruning rather than removal: lifting the canopy, taking limbs off the roof and thinning so crowns don't touch. See lopping and pruning for that side of the work.
Getting ready before the Fire Danger Period
The City of Greater Bendigo says "you must clear your property of fire hazards before the start of the Fire Danger Period and maintain it throughout". Its fire prevention officers inspect properties and may send a Fire Prevention Notice, usually giving about three weeks to cut grass and remove flammable rubbish; if the hazard is still there on re-inspection, council can send in a contractor. On 12 October 2026 the CFA listed no Fire Danger Period dates for Greater Bendigo yet, so check its fire restriction dates page as summer approaches.
Book tree work well before summer, so the cut material is chipped and gone before the Fire Danger Period starts. The cut timber needs a plan too: the CFA lists your green bin, a local tip that takes green waste, mulching well away from the house, or a contractor. Chipping on site is how we deal with it; we don't burn green waste.
Before anyone cuts
- Download your VicPlan report: is the land in a bushfire prone area, the BMO, or a vegetation overlay?
- Check when the house was built or approved, against 10 September 2009
- Measure out 10 m (trees) and 30 m or 50 m (other vegetation) from the house
- For a native tree outside those distances, read the permit guide and confirm with council on 1300 002 642
- Get written permission before clearing anything on a neighbour's side
Fire-season enquiries come in from the bush suburbs every spring, including Maiden Gully and Strathfieldsaye. For what a removal costs once you know it's allowed, see the published tree removal prices.
Questions about bushfire overlay and 10/30 rule
What is the 10/30 rule in Victoria?
It's the CFA's name for the Clause 52.12 exemption: in a bushfire prone area you can clear any vegetation, including trees, within 10 metres of a house built or approved before 10 September 2009, and any vegetation except trees within 30 metres, without a planning permit.
Does the Bushfire Management Overlay stop me removing trees?
The overlay itself controls subdivision and buildings and works, not tree removal. Clearing still depends on the native vegetation rules and any other overlays. In the BMO, the exemption for vegetation other than trees extends to 50 metres from an older house.
My house was built after 2009. Can I still clear around it?
The CFA says you will likely need a permit, and to contact council. Houses approved in a BMO since then usually came with their own defendable space conditions, so check your planning permit too.
How do I know if my property is in the BMO?
Search your address in VicPlan and download the free planning property report. It lists overlays, including the BMO, and whether the land is in a designated bushfire prone area.
Can I clear my neighbour's side of the fence?
Only with their written permission, the CFA says. The fence-line exemption allows a combined 4 metres across both sides of a boundary fence built before 10 September 2009.
Where this information comes from
The rules and figures on this page come from these published pages, checked on 27 September 2026.
- CFA: removing vegetation, trees and other plants · Country Fire Authority guide to the bushfire exemptions, updated 1 October 2026
- Greater Bendigo Planning Scheme, Clause 52.12 Bushfire protection exemptions · The 10/30 and fence-line exemptions
- Greater Bendigo Planning Scheme, Clause 44.06 Bushfire Management Overlay · When the BMO needs a permit for buildings, works and subdivision
- Greater Bendigo Planning Scheme, Clause 53.02 Bushfire planning · Defendable space vegetation management requirements (Table 4), clause 53.02-5 dated 05/05/2026 VC248
- VicPlan · Victorian Government map for planning property reports (zones and overlays)
- City of Greater Bendigo: fire hazards and prevention notices · Council inspections and Fire Prevention Notices before the Fire Danger Period
- CFA: fire restriction dates · Fire Danger Period declarations by municipality
- City of Greater Bendigo: fires, burn-offs and permits · Council rules on burning garden waste
- Greater Bendigo Planning Scheme, Clause 52.17 Native vegetation · State-wide native vegetation provision and its table of exemptions